Tenderskhoj
Ukraine
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Ukraine Reconstruction Of The Power Supply System With The Installation Of A Solar Power Plant With A Capacity Of 605.00/696.96 Kw (ac/dc), At The Address: Zakarpattia Region, Uzhgorod City, Novodomanynska Street, 27
10 May 2024
Ukraine Charging Stations With The Possibility Of Connecting A Solar Panel From 0.5 Kw/h, 500-700 W
09 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Kns "parnikova", Zhytomyr, Str. Parnikova, 8a
02 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Kns "zsa", Zhytomyr, Str. Lonkova, 12
02 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Vns Iii Lift "northern Zahidny", City Of Zhytomyr, Str. Klosovsky, 1
01 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Vns Ii, Zhytomyr, Str. Chudnivska, 120
01 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Vns Iii "kroshnya", Zhytomyr, Str. Pokrovska, 96a
01 May 2024
Ukraine Construction Of A Solar Power Plant At The Site Of Zhytomyrvodokanal Kp, Seletska Kns, Zhytomyr, Str. Cosmonautiv, 58
02 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Kns "chudnivska 3a", Zhytomyr, Str. 20b
02 May 2024
Ukraine Construction Of A Solar Power Plant At The Facility Of Kp "zhytomyrvodokanal" Osk-2, Zhytomyr, Str. Promyslova, 1
03 May 2024