Tenderskhoj
Tanzania
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Tanzania Routine Maintenance (6km) And Construction Of Culvert 2lines Along Uyui - Manoleo Routine Maintenance (12km)spot Improvement (1.0km) Construction Of Culvert 3lines Along Ndevelwa, Routine Maintenance (7km)spot Improvement (0.5km) Periodic Maintenance 3.0k
14 Jun 2024
Tanzania Bridge Construction,spot And Periodic Maintenance At Madaba Roads
14 Jun 2024
Tanzania Periodic Maintenance (2.35km) And Construction Of Drain 1km, Culvert 4&slab 15 Along Italiano , Periodic Maintenance (1.8km) And Construction Of Culverts 5lines Along Magereza - Timkeni And Construction Of Box Culvert 01 And Side Drains 0.4km Along Imalam
14 Jun 2024
Tanzania Construction Of Box Culverts Along Kkkt Mabatini (2 Lines), Utemini ( 4 Lines), Mtakuja Kakebe (1 Line), Igubinya (1 Line), Mkuyuni (1 Line), Kishira (1 Line), Kishiri A (1 Line) And Sommy (2 Lines) Along Nyamagana District
13 Jun 2024
Tanzania Routine Maintenance, Spot Improvement And Construction Of Side Drain And Pipe Culvert Along Moivaro 1.5km,onsea-moivaro 2km,laizer 2km,relini-kambi Ya Chupa 3.5km, Moshono-kwa Mrefu 2.3km And Baracuda 1.7km Roads
12 Jun 2024
Tanzania Routine Maintenance, Spot Improvement And Construction Of Box Culvert Along Shamsi-kibanda Maziwa 1.6km,bppass-mateves 3km,giriki 1.7km,mateves 9km,kwa Msemo2km,njia Ya Ng%ombe 2km,zulu(miti Mirefu) 2km And Urundini 1.6km Roads
12 Jun 2024
Tanzania Periodic Maintenance Along Gomba Estate -msitu Wa Mbogo And Mbuni-elmaroroi-kiseriani And Construction Of Two Arch Bridges And 400m Line
11 Jun 2024
Tanzania Construction Of Box Culvert Along Mkameni - Kilototoni P/s - Mabungo Road And Slab Culvert Along Ghona Vtc - Kiterini Iin Moshi District
11 Jun 2024
Tanzania Construction Of 5nos Pipe Culverts Along Ilolangulu- Nanda-isungabula, Construction Of 2nos Pipe Culvert Along Mwingiro-kagera Junction, Construction Of 2nos Pipe Culverts Along Lugunga- Mponda, Construction Of 3nos Pipe Culverts Along Mwanza-kanangwe-ilo
13 Jun 2024
Tanzania Routine Maintenance 14km, Construction Of 2line Along Nyamikoma-lwenge Road, Construction Of Box Culvert Along Kamhanga-ibisabageni Road, Construction Of 3line Along Mkoba Bridge-lubanga Road, Construction Of 6line Along Bugalama-nyakaduha Road And Routin
13 Jun 2024