Tenderskhoj
Russian Federation
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Russian Federation Carrying Out Restoration And Repair Work On The Heater Treater Oil Treatment Unit At The Alekseevskaya Booster Station Of The Volgogradneftegaz Chamber Of Commerce And Industry Of Ritek Llc In 2024-2025.
21 Jun 2024
Russian Federation Supply Of A Block Of Dies, Taking Into Account The Shmr And Pnr According To The Questionnaire For Llc Lukoil-western Siberia
21 Jun 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of 0.4 Kv Overhead Line For Electric/supply Non-residential Buildings: On The Charger With Cad. No. 21:11:000000:61. The Site Is Located Approximately 200 M South-west From The Landmark.
20 Jun 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply Of Low-rise Residential Buildings At The Address: Chuvash Republic, Cheboksary Municipal District, Syatrakasy Village, St. School, Memory With C
20 Jun 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply Of Low-rise Residential Buildings At The Address: Chuvash Republic, Kanashsky Moscow Region, Lesnoy Vysel, St. Kanashskaya, Unit 5 (zu With Cad.
20 Jun 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply To Non-residential Buildings At The Address: Chuvash Republic, Cheboksary Municipal District, Sinyalskoe Rural Settlement, Land Plot With Cad. N
20 Jun 2024
Russian Federation Construction And Installation Work On The Tp Facility. Installation Of An Electricity Metering Unit For Power Supply To Non-residential Buildings At The Address: Chechnya, Tsivilsky Municipal District, Territory Of The Znamya Agricultural Production Compl
20 Jun 2024
Russian Federation Repair And Maintenance Of Road Construction Equipment (sakhalin Island)
18 Jun 2024
Russian Federation The Right To Enter Into An Agreement To Carry Out Construction, Installation And Commissioning Work On The Installation Of A Potential Equalization System, External Grounding Loop, Automation Of Fire Protection Systems, Automatic Fire Extinguishing, Telep
15 Jul 2024
Russian Federation Execution Of Construction And Installation Work At The Facility fuel And Lubricants And Methanol Reception And Storage Area In The Pre-plant Zone
19 Jun 2024