Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply To Non-residential Buildings At The Address: Chuvash Republic, Cheboksary Municipal District, Sirmaposinskoe Rural Settlement, (land Plot With C
08 May 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply Of Low-rise Residential Buildings At The Address: Chuvash Republic, Cheboksary, Snt "yubileiny", Site 2001 (land Plot With Cadastral Number 21:0
08 May 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply Of Low-rise Residential Buildings At The Address: Chuvash Republic, Cheboksary Municipal District, Yurakovo Village, Land Plot With Cadastral Nu
08 May 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply Of Low-rise Residential Buildings At The Address: Chuvash Republic, Cheboksary Municipal District, Chirskasinsky Joint Venture, St "rosa", Site
08 May 2024
Russian Federation Construction And Installation Work On The Tp Facility. Construction Of A 0.4 Kv Overhead Line For Power Supply Of Low-rise Residential Buildings At The Address: Chuvash Republic, Tsivilsky Municipal District, Baidushi Village, St. Pushkina, 23a (zu With C
08 May 2024
Russian Federation Construction And Installation Work Laying Of A 6 Kv Power Transmission Line From The Studencheskaya Substation To The Designed 6 Kv Transformer Substation On A Land Plot With Cadastral Number 21:01:010306:82 At The Address: Sh. Yadrinskoye, 3, Cheboksary
13 May 2024
Russian Federation Piping Works At Lukoil Station Kontich
30 Jun 2024
Russian Federation Carrying Out Commissioning Work For Railway Diesel-electric Shunting Robots Vollert Der 150 In The Amount Of 3 Units. Llc "lukoil-permnefteorgsintez" 2024
13 May 2024
Russian Federation Carrying Out Construction, Installation And Commissioning Work On The Project increasing Oil Supplies To 15.2 Million Tons. Installation Of A Diesel Fuel Pipeline For Llc Lukoil-volgogradneftepererabotka In 2024-2025.
13 May 2024
Russian Federation Roadworks Lukoil Station Kontich
30 Jun 2024