LOCATION | SUMMARY | DEADLINE |
---|---|---|
Portugal | Preparation Of Execution Project Ic 1 – Bridge Over The Mira River (km 680.540) To The Beja/faro District Border (km 697.480)Estimated Cost :30000000 EUR |
18 Oct 2024 |
Portugal | Rehabilitation Of The Hydraulic Structures Of The Ribeira Brava Downstream Of The Red BridgeEstimated Cost :2500000000 EUR |
14 Oct 2024 |
Portugal | Rehabilitation Of The Hydraulic Crossing Over The Mondego River In Sra. Assedasse |
09 Nov 2024 |