Tenderskhoj
Poland
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Poland Purchase And Delivery Of Materials - Road Salt And Washed Sand 0-2 Mm - For Winter Maintenance Of Roads And District Streets In The Winter Season 2023-2024, Divided Into 2 Parts
14 May 2024
Poland Construction Of An Lv Cable Line - Obi/45/2301930; Slesin Rural Area; Rebowo (part Of The Town)
20 May 2024
Poland Construction Of A Mv/lv Pole Transformer Station, Mv And Lv Cable Lines, Division Of The Network (take Into Account Obi/36/2300967) According To Wbs, Wp; Szemud, A Rural Commune; Dobrzewino (village)
09 May 2024
Poland Order Notice works modernization Of Road Infrastructure In The Czastary Commune
14 May 2024
Poland Notice Of Execution Of The Contract works construction Of The Lower Silesian Bicycle Skills Park In Strzegom
13 May 2024
Poland Execution Of Lv Connections/cable Lines With A Length Of 31 To 60 M, The Length Of Which Is Determined By The Length Of The Cable Section Used For Construction, Terminated With 1 Cable Connector (p1 Or P2) In The Area Of ??operation Of Rd In Torun
08 May 2024
Poland Execution Of Lv Connections/cable Lines Up To 30 M Long, The Length Of Which Is Determined By The Length Of The Cable Section Used For Construction, Terminated With 1 Cable Connector (p1 Or P2) In The Area Of ??operation Of Rd In Torun
08 May 2024
Poland Execution Of Lv Connections/cable Lines With A Length Of 61 To 100 M, The Length Of Which Is Determined By The Length Of The Cable Section Used For Construction, Terminated With 1 Cable Connector (p1 Or P2) In The Area Of ??operation Of Rd In Torun
08 May 2024
Poland W + P - Execution Of Works + Preparation Of Documentation; Plock Branch; Construction In Rs Windyka Of Infrastructure Enabling The Transformation Of Energy From The 110 Kv Network To The 15 Kv Network And Connections Of The New 15 Kv Switchgear With The E
09 May 2024
Poland W - Execution Of Works; Koszalin Branch; Koszalin, Skwierzynka (village)
14 May 2024