Tenderskhoj
Morocco
- Consultancy Engineering
LOCATION SUMMARY DEADLINE
Morocco Control And Monitoring Of The Quality Of Work To Improve The Level Of Service Of The Rn 17 From Pk889+634 To Pk897+366 And The 4km Ramp Serving Zagora Airport. Province Of Zagora.
Estimated Cost :423040 MAD
23 May 2024
Morocco The Architectural Study And Monitoring Of The Construction Works Of El Guentour Circle In The Province Of Youssoufia.
Estimated Cost :2400000 MAD
21 May 2024
Morocco Architectural Study And Monitoring Of Demolition And Construction Works Of Administrative Housing In Echemaia In The Province Of Youssoufia
Estimated Cost :1776000 MAD
21 May 2024
Morocco Geotechnical Study, Quality Control And Monitoring Of Construction Work Of Three (03) Educational Establishment Reporting To The Provincial Directorate Of Guercif
Estimated Cost :288000 MAD
23 May 2024
Morocco Geotechnical Study, Quality Control And Monitoring Of Construction Work Of Four (04) Educational Establishment Reporting To The Provincial Directorate Of Berkane
Estimated Cost :390000 MAD
23 May 2024
Morocco Development Of Architectural Studies And Monitoring Of Construction Work For A Brigade And 14 Staff Housing For The Royal Gendarmerie Of Moulay Yaakoub, Fez Region
Estimated Cost :14400000 MAD
23 May 2024
Morocco Geotechnical Study, Quality Control And Monitoring Of The Construction Work Of The Oulad Boubker College Reporting To The Driouech Provincial Directorate
Estimated Cost :100000 MAD
23 May 2024
Morocco Geotechnical Study, Quality Control And Monitoring Of Construction Work Of The Fatima Al Fihria Cu Taourirt College And The Educational Complex, Anoual Commune Machrae Hammadi Reporting To The Provincial Directorate Of Taourirt
Estimated Cost :174000 MAD
23 May 2024
Morocco Land Development Work Relating To The Protection Of Agricultural Land On The Banks Of Wadis And The Correction Of Ravines Across Ct Labiar, Rass Oumlil And Plage Blanche, Province Of Guelmim.
Estimated Cost :1776000 MAD
27 May 2024
Morocco Technical Study, Monitoring And Coordination Of The Work Of The Al Manzah Tr1 And Tr2 Housing Construction Operations Located At The Al Boustane Tr1 Subdivision In Oued Zem
Estimated Cost :971280 MAD
29 May 2024