Tenderskhoj
Morocco
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Morocco Development Works At The Crossroads Connecting The Maritime Route From The Port Of Casablanca To The Regional Road 322 Lot 4: Public Lighting Of The Maritime Route
Estimated Cost :6911760 MAD
21 Jun 2024
Morocco Mobility Infrastructure Development Program Between The Prefecture Of Casablanca And The Province Of Nouaceur: Rev-lot 1: Wall Coverings Of The Rr320 Hoppers
Estimated Cost :30888000 MAD
16 Jul 2024
Morocco Road Opening And Redevelopment Works In The Sidi Bernoussi District Prefecture: Lot 3: Sb7-sb10
Estimated Cost :58012619 MAD
01 Jul 2024
Morocco Development Work Of The Track Network On A Linear Of 17,646 Km In The Removal Sector In Bour Bkhati, Bkhati Territorial Commune, Abda Circle, Province Of Safi. Marrakech Safi Region
Estimated Cost :3738013 MAD
16 Jul 2024
Morocco Public Lighting Works Relating To The Requalification Of The Sidi Kacem Industrial Zone - Single Lot -.
Estimated Cost :4115586 MAD
18 Jul 2024
Morocco Public Lighting Works Relating To The Leveling Of The Telaa Road Towards The Cemetery Of The City Sidi Allal El Bahraoui - Single Lot -.
Estimated Cost :2509680 MAD
16 Jul 2024
Morocco Technical Control And Monitoring Of The Extension Work Of The Ouled Tayeb Center School And The Fquih Tawdi And Jabir Ibn Hayan College High Schools Reporting To The Fes Dp
Estimated Cost :100000 MAD
10 Jul 2024
Morocco Technical Studies And Monitoring Of The Development Work Of The Qualifying High School Ibn Khaldoun Located In The Urban Community Merinides And Reporting To The Provincial Directorate In Fes (in A Single Lot)
Estimated Cost :60000 MAD
11 Jul 2024
Morocco Amphitheatre Development Works For The Benefit Of The El Jadida National School Of Commerce And Management
Estimated Cost :888000 MAD
11 Jul 2024
Morocco Technical Studies And Monitoring Of The Construction Work Of The Enclosing Walls Of Schools: Imam Ghazali 1, Abderahmane Ibn Zidane And Ahmed Tayeb Laalaj Located In The Commune Urbaines Les Merinides And Reporting To The Dp Of Fez
Estimated Cost :25000 MAD
10 Jul 2024