Tenderskhoj
Morocco
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Morocco Development Work Within The 03 (three) Pioneer Primary Schools Ankara, Omar Mekri And Idrissia Under The El Fida Mers Sultan Provincial Management
Estimated Cost :580968 MAD
27 May 2024
Morocco Development Work Within 02 (two) Pioneer College High Schools Under The El Fida Mers Sultan Provincial Management: The Imam Elkastalani College High School And The Rabia Al Adawia College High School.
Estimated Cost :537900 MAD
27 May 2024
Morocco Clearing Work Around The Forest Road Over A Length Of 2620 Ml Located In The Commune Of Mharza Sahel, Province Of El Jadida (single Lot).
Estimated Cost :29868 MAD
03 Jun 2024
Morocco Construction Of A 3500m3 Semi-buried Tank And A 500m3 Raised Tank In Beni Mellal Agropole Sector
Estimated Cost :16768620 MAD
04 Jun 2024
Morocco Additional Road And Sanitation Works From Douar Lakhwimate To The Tassoultate Commune - Marrakech Prefecture.
Estimated Cost :424271 MAD
04 Jun 2024
Morocco Development And Rehabilitation Work On Pioneer School Establishments Under The Provincial Directorate Of Kenitra In (03) Separate Lots: Lot No. 1: Development And Rehabilitation Work On Pioneering Primary Schools: El Kadi Ayad And Ouled Taleb In La Provin
03 Jun 2024
Morocco Construction Work On A Camel And Goat Fattening Center And A Milking Building In The Community Of Bir Gandouze Province Of Aousserd.
Estimated Cost :3776003 MAD
03 Jun 2024
Morocco Execution Of Maintenance Work On Twelve Thousand Linear Meters (12,000 Ml) Of Firebreak Trenches Located Inside The Territorial Commune Of Ain Tizgha, Benslimane Forest, Benslimane Province (single Lot).
Estimated Cost :120000 MAD
03 Jun 2024
Morocco Carrying Out Control Tests And Monitoring The Quality Of The Widening And Strengthening Works Of The Rr112 From Pk 136+800 To Pk 150+800 (e.g. Rp1739 From Pk0+000 To Pk14+000), Province Of Taroudannt.
Estimated Cost :830872 MAD
04 Jun 2024
Morocco 1-technical Study Of The Construction Work In Two-layer Coating Of The Trails Of The Following Trails:the Track Connecting The Rr 305 Towards Ouled Said With A Length Of 3km:the Track Connecting The Rp 3624 Towards Douar Sidi Belgassem With A Length Of 2k
Estimated Cost :253680 MAD
03 Jun 2024