Tenderskhoj
Morocco
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
Morocco Study To Widen And Strengthen The Rr504 From Pk 46+776 To Pk 65+776 (province Of Sefrou).
Estimated Cost :223320 MAD
15 Jul 2024
Morocco Study To Widen And Strengthen The Rr504 From Pk 65+776 To Pk 83+776 (province Of Sefrou)
Estimated Cost :212040 MAD
15 Jul 2024
Morocco Public Lighting Works In The Province Of Al Hoceima (tranche 12)
Estimated Cost :5670651 MAD
19 Jul 2024
Morocco Definition Study Of The Connection Highway Between The Rabat-casablanca Continentale, Rabat-fes And Kenitra-tangier Highways
Estimated Cost :3000000 MAD
31 Jul 2024
Morocco Technical Study And Monitoring Of Road Development Works And Sidewalks In The Al Idari District, Al Amal 1 District, Al Amal2 District, Assalam District And Al Mokhayam District. In The City Of El Ouatia Province Of Tantan.
Estimated Cost :996000 MAD
16 Jul 2024
Morocco Public Lighting Works Relating To The Requalification Of The Sidi Kacem Industrial Zone - Single Lot -.
Estimated Cost :4115586 MAD
18 Jul 2024
Morocco (pc2024) Supply And Installation Of Safety Barriers And Vertical Traffic Signs Required For The Road Network Covered By The Boulemane Dpetl. Boulemane Province
Estimated Cost :369720 MAD
17 Jul 2024
Morocco Study Of The Penetration Of The Guelmim-tantan Expressway At Rass Oumlil From Aouint Ighoumane Over 32 Km: - Upgrading Of The Rp1303 From Pk37+000 To Pk50+000 Over 14 Km - Construction Of The Unclassified Road Connecting The Rp1303 To The Guelmim-tantan E
Estimated Cost :574320 MAD
11 Jul 2024
Morocco Geotechnical Study For The Construction Of The Engineering Structure At Pk15+250 Of The Rp 3100 On Oued Laabid In The Azilal Province.
Estimated Cost :74400 MAD
09 Jul 2024
Morocco Improvement And Strengthening Of The Public Lighting Network Of The City Of Zagora (energy Efficiency Installation Works) -zagora Province-
Estimated Cost :1200024 MAD
11 Jul 2024