Tenderskhoj
Morocco
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Morocco Two-layer Surface Coating Work Of Rp 3224 From Pk 36+800 To Pk 46+600 And Of Rp 3220 From Pk 0+000 To Pk 20+570 On Discontinuous Sections (province Of Fquih Ben Salah)
Estimated Cost :2124456 MAD
23 May 2024
Morocco Quality Control Of Flood Damage Repair Works At Pk12+000 Of Rp2009 – Al Haouz Province
Estimated Cost :66960 MAD
22 May 2024
Morocco Quality Control And Monitoring Of Flood Damage Repair Works Occurring On Rp2117 From Pk20+000 To Pk43+000 -al Haouz Province-
Estimated Cost :45336 MAD
22 May 2024
Morocco Repair Work For Flood Damage Occurring On Rp2117 From Pk20+000 To Pk43+000 - Province Of Al Haouz-
Estimated Cost :892500 MAD
22 May 2024
Morocco Construction, Rehabilitation And Development Work On The Rural Road Linking Douar Tahammout And Douar Tamaghout Over A Length Of 8 Km At The Level Of The Zagmouzen Territorial Collectivity, Province Of Taroudant.
Estimated Cost :15817942 MAD
20 May 2024
Morocco Provision Of Street Paving
Estimated Cost :1240224 MAD
21 May 2024
Morocco Horizontal Signaling Work On The Rn9 From Pk 460+500 To Pk 615+000 In Discontinuous Sections Depending On The Dpetl Of Zagora, Province Of Zagora.
Estimated Cost :1387289 MAD
21 May 2024
Morocco Development Works From Lamsala To Ahfir - Province Of Berkane -
Estimated Cost :1648440 MAD
23 May 2024
Morocco Pc2024 - Rehabilitation And Environmental Treatment Works For Roads Dependent On The Dpetl De Guercif
Estimated Cost :1688148 MAD
21 May 2024
Morocco (pc 2024) Reloading Of Road Shoulders: - Rr 202 From Pk 39+000 To Pk 66+000 - Rp 3430 From Pk 24+500 To Pk 37+500 - Rp 3415 From Pk 08+500 To Pk 11+500 Province By Sidi Bennour
Estimated Cost :3001680 MAD
21 May 2024