Tenderskhoj
Morocco
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Morocco Road Development Work Connecting Between National Road No. 7 And Douar Cemetery Guarrando Commune Of
Estimated Cost :188000 MAD
04 Jul 2024
Morocco Upgrading Works On The Unclassified Road Connecting The Rp1920 To Aoudint Via Douars Ahlbakrim, Elhrabla And Tahdayirt For A Length Of 9.3 Kms In The Community Of Sbouya (province Of Sidi Ifni).
Estimated Cost :11599280 MAD
03 Jul 2024
Morocco Work On Horizontal Signaling Of Rp 2200 From Pk 36+000 To Pk 50+000 (province Of Youssoufia) -marrakech--safi Region
Estimated Cost :83880 MAD
04 Jul 2024
Morocco Topographic Control Of The Construction Works Of The Headquarters Of The National Ports Agency
Estimated Cost :2040000 MAD
02 Jul 2024
Morocco Pc 2024: Two-layer Surface Coating Work In Discontinuous Sections Of Rp 5400 From Pk 12+075 To Pk 24+600 And On Rp5202 From Pk 0+000 To Pk26+000 – Al Hoceima Province.
Estimated Cost :1280640 MAD
02 Jul 2024
Morocco Restoration And Rehabilitation Work On Historic Walls In The Medina Of Meknes, City Of Meknes, In Two Separate Lots: - Lot N°1: Sections: Zine Al Abidine_ Sahrij Souani, 2nd Tranche; - Lot N°2: Sections: Lahboul/bab Gnaoua_ Assarag, _golf Royal, 2nd Secti
02 Jul 2024
Morocco Work To Split The Rr 707 Between Pk 10+459 And Pk 19+000 – El Hajeb Province –
Estimated Cost :90910122 MAD
25 Jul 2024
Morocco Development Work Of Command Posts Of Local Authorities In The Province Of Essaouira Pachalik Tamanar-cercle Tamanar-cercle Essaouira -caidat Ounagha-pachalik Talmest -caidat Regragua-annex Azelf
28 Jun 2024
Morocco Construction Work On The Rnc Roadway Linking Imouzzer Kandar And The Rp5021 Over 1,312 Km (province Of Sefrou)
Estimated Cost :1211334 MAD
03 Jul 2024
Morocco Construction Work On An Educational Block On The Ground Floor And Two (2) Floors (ground Floor + 2) Within The Ecole Normale Supérieure Of Tetouan
Estimated Cost :19109520 MAD
02 Jul 2024