Tenderskhoj
Malaysia
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
Malaysia Provide Manpower, Equipment, Transportation And Other Requirements To Carry Out Boiler Stack Sampling Works _ Stack Emission Monitoring Boiler (stack Sampling) For Factories In Region 4 (palm Oil Mills Bkt. Mendi, Pasoh, Kemasul, Keratong 2, Keratong 3, K
06 May 2024
Malaysia Provide Manpower, Materials, Equipment, Transportation And Other Requirements To Do The Work Of Opening, Recond And Installing The Worm Screw Shredded Machine No.1 At The Kalabakan Palm Oil Mill.
02 May 2024
Malaysia Provide Manpower, Equipment, Transportation And Other Requirements To Carry Out Annual On-site Audiometric Testing For 640 People Including Medical Examination And Retest Requirements For Factories In Region 4 (ks Bkt. Mendi, Pasoh, Kemasul, Keratong 2, K
06 May 2024
Malaysia Provide Labor (legal Drivers) And Vehicles To Transport Fertilizer From The Store To The Farm (including Loaders) Amounting To 14,705 Bags.
06 May 2024
Malaysia Provide Manpower, Materials, Equipment, Transport And All The Requirements To Carry Out Medical Surveillance For Factories In Region 4 (ks Bukit Mendi, Pasoh, Kemasul, Keratong 2, Keratong 3, Keratong 9, Selendak, Serting And Serting Downstream) For The Y
06 May 2024
Malaysia Provide Manpower, Materials, Equipment, Transportation And All Related Requirements To Carry Out Chemical Exposure Monitoring At The Workplace (chemical Exposure Monitoring) For Factories In Region 4 (bukit Mendi, Pasoh, Kemasul, Keratong 2, Keratong 3 Oi
06 May 2024
Malaysia Appointment Of Manpower Supply For Independent Cybersecurity Assessor (icsa) For The Development Of Kuching Urban Transportation System (kuts) Project
20 May 2024
Malaysia Providing Transport (lorry) & Manpower To Carry Out The Work Of Transporting & Delivering Felda Mulch Products From Tawau Port To Farms All Over Sabah & From Kuching Port To All Of Sarawak.
03 May 2024
Malaysia Provide Manpower, Transportation And Other Complete Requirements To Carry Out The Work Of Transferring Bts From Ks Jengka 21 To Ks Seroja (200mt), Ks Jengka 3 (600mt), Ks Kota Gelanggi (100mt) And Ks Lepar Utara 6 Amounting To 1000mt Starting 15/04/2024 T
04 May 2024
Malaysia Providing Manpower, Equipment, Materials, Transportation And Other Requirements For The Work To Repair The Leakage Of The Chute Loading Ramp Floor And Ffb Conveyor 1b At The Jengka 3 Oil Palm Factory.
03 May 2024