Tenderskhoj
Kyrgyzstan
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Kyrgyzstan Construction Of A Water Pipeline From Kuluk-dobo With Connection To The Existing System Of Kerben, Aksy District
Estimated Cost :5000000 KGS
12 Jun 2024
Kyrgyzstan Development Of A Sanitary Protection Zone Project
10 Jun 2024
Kyrgyzstan Construction Of A Water Pump System With The Construction Of A 0.4 Kw Power Line For Drinking And Irrigation Water Supply To The Residents Of The Ak-por Section Of The Yylkol Village Of The Ylay-talaa Rural Government.
Estimated Cost :1673850 KGS
21 Jun 2024
Kyrgyzstan Repair Of The Tuloberdi Canal On The Tuloberdi Section Of Sai Kanysh-kiya A/o
Estimated Cost :818362 KGS
12 Jun 2024
Kyrgyzstan Construction Of Sewers On S. Kandybaev Street Mkr Kurmanbek
04 Jun 2024
Kyrgyzstan Purchase Of A Biological Wastewater Treatment Plant.
Estimated Cost :1800000 KGS
03 Jun 2024
Kyrgyzstan Rehabilitation Of An Existing Ditch With The Installation Of A Drainage Tray On T. Kyrbashev Street In The Village Of Konurat, Sarai Aimag, Kara-suu
Estimated Cost :2002635 KGS
04 Jun 2024
Kyrgyzstan Purchase Of A Water Pipe For Bringing Clean Water To Moltok-sai Street Of Zylgyn Village Of Sary-chelek Village Government
03 Jun 2024
Kyrgyzstan Purchase Of Polyethylene Drinking Pipes, Pipe Laying Equipment, Reinforced Concrete Wells And Slabs
Estimated Cost :2999813 KGS
04 Jun 2024
Kyrgyzstan Construction Of A Water Pump System With The Construction Of A 0.4 Kw Power Line For The Purpose Of Providing Drinking And Irrigation Water To The Residents Of The Ak-por Section Of The Yylkol Village Of The Ylay-talaa Rural Government.
Estimated Cost :1673850 KGS
21 Jun 2024