Tenderskhoj
Kyrgyzstan
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Kyrgyzstan Drilling A Hydrogeological Water Well For Drinking Water Supply To The Southern Zone Of The Population Of The Village Of Baizak Aiyl Aimak
Estimated Cost :4169440 KGS
27 May 2024
Kyrgyzstan Services For Drawing Up P.s.d. On Site: Construction Of A Modern Football Field With A Running Track, An Arena, Spectator Seats And A Six-seat Toilet On Them. A. Duyshobaeva, In The City Of Kerben. (repeat)
Estimated Cost :700000 KGS
17 May 2024
Kyrgyzstan Relocation Of The 10 Kv Overhead Power Line And Transformer Substation In The Village Of Bayet
Estimated Cost :696785 KGS
17 May 2024
Kyrgyzstan Pothole Repair Of Asphalt Pavements On Streets In Kyzyl-kiya
Estimated Cost :1000000 KGS
16 May 2024
Kyrgyzstan Construction Of A Park In The Village Of Cholponbay, Aitmatovsky District.
Estimated Cost :2000000 KGS
27 May 2024
Kyrgyzstan Asphalting Zhany-turmush Street In The Village Of Zhany-turmush, Katta-taldyk Aa, Karasu District
Estimated Cost :4403125 KGS
27 May 2024
Kyrgyzstan Construction Of A Kindergarten For 50 Children In The Village Of Kok-dobo, Aitmatovsky District (2nd Stage)
Estimated Cost :2500000 KGS
27 May 2024
Kyrgyzstan Construction Of A Garage With Warehouses At The Bakai-ata Central Park And State Sanitary Service
Estimated Cost :2701083 KGS
27 May 2024
Kyrgyzstan Construction Of A Mini-football Field In The Village. Chat-kel
Estimated Cost :3031331 KGS
27 May 2024
Kyrgyzstan Repair Work On Heating At A. Usenbaev’s School
Estimated Cost :3426182 KGS
27 May 2024