Tenderskhoj
Iran Islamic Republic of
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Iran Islamic Republic of Implement Projects Of Development And Construction And Improvement Distribution Networks At Power Areas 7,324,000,000 Rial
07 Jul 2024
Iran Islamic Republic of Implement Projects Of Development And Construction And Improvement Distribution Networks At Power Areas Pakdasht
07 Jul 2024
Iran Islamic Republic of Widening And Improvement Channel Exist At Margin Highway Shrine To Shrine-section Qom-garmsar, Between Km 30 To 80 With Length 50 Km At Both Sides (total 100 Km) In Sizes 3m (width) And 2 M(depth)
22 Jun 2024
Iran Islamic Republic of Implement Projects Of Development And Construction And Improvement Distribution Networks At Power Areas Pakdasht
07 Jul 2024
Iran Islamic Republic of Improvement And Preparation Streets, Buildings And Gardens (bolvar Madayen, Heydari Street , Vahdat Street And Etc )
Estimated Cost :62233229890 IRR
25 Jun 2024
Iran Islamic Republic of Repair And Improvement Channel Pakravan And Repair Channel Khashayar At Area
Estimated Cost :142024567153 IRR
26 Jun 2024
Iran Islamic Republic of Implement Projects Of Development And Construction And Improvement Distribution Networks At Power Areas Pakdasht
07 Jul 2024
Iran Islamic Republic of Works Of Plan 20 Areas And Road Map Of River And Road Divider And Construction Pavement At Section 3
Estimated Cost :49505311160 IRR
25 Jun 2024
Iran Islamic Republic of Implement Projects Of Development And Construction And Improvement Distribution Networks At Power Areas Pakdasht
07 Jul 2024
Iran Islamic Republic of Improvement And Preparation Streets, Buildings And Gardens(17 Shharivar Street, Taghavi Street And Etc)
Estimated Cost :62465800132 IRR
25 Jun 2024