Tenderskhoj
Georgia
- Consultancy
LOCATION SUMMARY DEADLINE
Georgia Processing Of Project Documentation (detailed Working Project), Preparation Of Local-resource Cost Estimates, Examination (inspection) Of The Foundation Sites Of Supports No. 280 And No. 307 Of 220 Kv Substation "batumi 1-2" And Structures Protecting The
16 May 2024
Georgia Procurement Of Design/cost Accounting Documentation For The Construction/facility Arrangement Of The Name Sign Of Tetritskaro Municipality (at 3 Different Locations).
08 May 2024
Georgia On "project And Cost Accounting Documentation Of Rehabilitation Works Of Outdoor Lighting At The Entrance Of The House Of Culture In The Vicinity Of Stalin Street In Vale, Akhaltsikhe Municipality"
07 May 2024
Georgia Stadium And Square On Energy Street In Gardabani; Compilation Of Design And Cost Accounting Documentation Necessary For The Rehabilitation Of The Square Near 9 May Street And The Square On Ninoshvili Street.
10 May 2024
Georgia St. In Tetritskaro, The Procurement Of Design And Cost Accounting Documentation For The Rehabilitation Works Of The Part Of Agmashenebeli Street (150 Long/m Adjacent To The Spring), Kazbegi Alley (90 Long/m), And Alleys Adjacent To Krtsanis Street (total
10 May 2024
Georgia Coastal Zone Spatial Development Plan Of Georgia
15 May 2024
Georgia 1.1.1. Within The Scope Of One Contract, By Design-build Method, Procurement Of Design/cost Documentation And Construction Works At Goderdzi Resort (in Khulo Municipality) In Connection With The Fencing Of The Surrounding Area Of ??green Lake, In Use By "
13 May 2024
Georgia Preparation Of Project Cost Accounting Documentation For The Arrangement Of A One-story Building For Commercial Spaces On Davit Aghmashenebeli Street In Lentekhi With Accompanying Expertise
10 May 2024
Georgia St. Design And Cost Accounting Documentation Preparation Services For The Rehabilitation Works Of The Drainage Channel In Front Of The Central Market On Rustaveli Street In Zugdidi.
08 May 2024
Georgia The Capital Project To Be Implemented Within The Framework Of The Capital Transfer To Shuakhevi Municipality Determined By The 2024 Republican Budget Of The Autonomous Republic Of Adjara (anti-landslide Measures) - The Construction Of A Retaining Wall Nea
17 May 2024