Tenderskhoj
Georgia
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Georgia Rehabilitation Works Of The Existing Bridge Over The Fafriskhevi River At Km 60 (59+813) Of The Akhmeta-telavi-bakurtsikhe Highway Of Domestic Importance (sh-42).
08 Oct 2024
Georgia Rehabilitation Works Of The Bridge Overpass On The Tsalki Ravine At Km 74 (km 73+020) Of The Koda - Fartskhis - Manglisi - Tsalka - Ninotsminda Highway Of National Importance (sh-31)
04 Oct 2024
Georgia Provision Of Rehabilitation Works Of The Existing Bridge On Kazbegi Street In Akhaltsikhe
25 Sep 2024
Georgia Rehabilitation Of The Road Bridge Over The Lascadura River In Lentekh Township
24 Sep 2024
Georgia Rehabilitation Works Of The Pedestrian Bridge In The Village Of Tedotsminda Of Gori Municipality "within The Framework Of The Village Support Program"
23 Sep 2024
Georgia Nakifus Ad. In The Unit, Qv. Procurement Of Construction Works Of Pedestrian Bridge In Lezha District
27 Sep 2024
Georgia In The Abedati Administrative Unit Of The Martvil Municipality, Md. Construction Of The Middle Pier Of The Metal Construction Bridge On Tarchen,
26 Sep 2024
Georgia Rehabilitation Works Of The Existing Bridge Over The Lopota River At Km 59 (58+520) Of The Tianeti-akhmeta-kvareli-ninigori Highway Of Domestic Importance (sh-43).
09 Oct 2024
Georgia Rehabilitation Works Of The Bridge Crossing On The Ravine At Km 90 (km 89+649) Of The Akhaltsikhe - Ninotsminda (border Of The Republic Of Armenia) Highway Of International Importance (s-11).
04 Oct 2024
Georgia Gabion Strengthening Works Of The Existing Metal Structure Bridge Over The Atamaskhevi River In The Foniave District Of The Kurzu Administrative Unit Of The Martvil Municipality.
26 Sep 2024