LOCATION | SUMMARY | DEADLINE |
---|---|---|
Ecuador | Reconstruction Of A Motorized Bridge In The Noisy Sector That Connects The Neighborhood Of Ten De August Canton To The Main Province Of CañarEstimated Cost :296701 USD |
02 May 2024 |
Ecuador | Reconstruction Of The Hanging Pedestrian Bridge Over The Palanda River, Santa Ana Archaeological Site SectorEstimated Cost :29910 USD |
26 Apr 2024 |
Ecuador | Construction Of The Patamarca Bridge - Over The Machángara River To Link Migrant Street With Javier Maldonado Street.Estimated Cost :1159672 USD |
26 Apr 2024 |
Ecuador | adaptation Of Access To The Vehicular Bridge Over The Nangaritza River, Las Orquídeas Sector, Zurmi Parish, Nangaritza Canton Estimated Cost :20282 USD |
26 Apr 2024 |