Tenderskhoj
Albania
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Albania Design Study: "construction And Increase Of The Capacity Of The Water Supply System In Blocks No. 1, 2, 3 And 4, In The Neighborhood Of Mar Lula, Shkoder"
04 Jul 2024
Albania Construction Of The Sewage Collector Bulevardi "jakov Xoxa", From The Ura Sheq Roundabout - Sharra Roundabout, Fier
27 Jun 2024
Albania Supervision Of Works For The Object "reconstruction Of The Network Of The Water Supply Line From The Boville Plant - Depot Maloku, Kamez Municipality".
24 Jun 2024
Albania National Hydrometeorological Expert (1 Position) National Digitalization Expert (1 Position)
20 Jun 2024
Albania Supervision Of Works For The Object: "construction Of The Kuz Network, Prrenjas City"
14 Jun 2024
Albania "powering The Irrigation Pumping Station From The Seman River, Suk-arapaj Area, Roskovec Municipality? (supply-installation)".
14 Jun 2024
Albania Reconstruction Of The Network Of The Water Supply Line From The Boville Plant - Depo Maloku, Kamez Municipality
18 Jun 2024
Albania "intervention For Establishing Sustainable Smeco Models In Villages With Development Potential: Systematization And Protection Of The Northern Embankment Of The Karavasta Lagoon From Erosion".
14 Jun 2024
Albania "repair And Maintenance Of Heating And Sanitary Water Systems With Boilers, Heating-cooling Systems With Chillers, Of The Central Station Of Pumps And Drinking Water Supply Systems, Of Electric Pumps, In The Buildings Of Hospital Services In
20 Jun 2024
Albania "design Study On The Hydraulic Network Of The City Of Tirana In Units 1,2,3,4,5 And The Regional Director"
01 Jul 2024