Tenderskhoj
Italy
- Industry Fire Safety and Security

A PHP Error was encountered

Severity: Notice

Message: Undefined index: It

Filename: ca/ca_list_view.php

Line Number: 17

Backtrace:

File: /home/tkhojuser/html/application/views/ca/ca_list_view.php
Line: 17
Function: _error_handler

File: /home/tkhojuser/html/application/controllers/Contract_Awards.php
Line: 331
Function: view

File: /home/tkhojuser/html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Undefined index: It

Filename: ca/ca_list_view.php

Line Number: 17

Backtrace:

File: /home/tkhojuser/html/application/views/ca/ca_list_view.php
Line: 17
Function: _error_handler

File: /home/tkhojuser/html/application/controllers/Contract_Awards.php
Line: 331
Function: view

File: /home/tkhojuser/html/index.php
Line: 315
Function: require_once

LOCATION SUMMARY DEADLINE
Italy Provision Of An Automated, Modular And Expandable Closed-loop Cryogenic System For The Investigation Of Physical Properties In The Presence Of Magnetic Fields At Variable Temperatures
29 Aug 2024
Italy Lot 1 - Oa24_0075 For The Assignment Of Services: Design And Safety Coordination In The Project Phase With The Option Of Work Management And Safety Coordination In The Execution Phase For The Construction Of Collective Bike Boxes And Shelters Outcome
Estimated Cost :74240 USD
28 Aug 2024
Italy Work Management And Safety Coordination - Rasun Di Sotto Football System - Renovation And Expansion Outcome
Estimated Cost :190290 EUR
22 Aug 2024
Italy Open Telematic Procedure For The Awarding Of Maintenance Services Of Fire Prevention Systems At Sites In Use For Any Reason To Local Authorities In The Campania Region
22 Aug 2024
Romania Protective Helmet For Firefighters
17 Aug 2024
Italy Lot 1 - Aov/sua-sai 027/2023 Design, Works Management And Safety Coordination In The Design And Executive Phase For The Construction Of A New Canteen In The tempesti Training Logistics Base In Corvara Outcome
Estimated Cost :539516 EUR
06 Aug 2024
Italy Assignment Of Definitive And Executive Design, Safety Coordination In The Design Phase Relating To The Hydraulic Risk Mitigation Intervention And Local Safety Measures. San Saved
03 Aug 2024
Italy Open Procedure, In A Centralized Form, For The Awarding Of The Supply Of Personal Protective Equipment (ppe) For Pan-flu 2021-2023
30 Jul 2024
Italy Open Procedure, In A Centralized Form, For The Awarding Of The Supply Of Personal Protective Equipment (ppe) For Pan-flu 2021-2023
30 Jul 2024
Germany Temperature Management System For The Extracorporeal Circuit
25 Jul 2024