Tenderskhoj
Bhutan
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Bhutan Widening & Blacktopping Of Samtse â Norbugang Industrial Road Snh Package - Ii (6.024 Km) Which Includes Widening/formation Cutting, P & L Gsb, P & L Wmm, P & L Dbm, P& L Ac, Construction Of Drains (l-drain/box Drain), Construction Of Pw, Construction Of
Estimated Cost :197085087 BTN
30 May 2026
Bhutan Resurfacing Of Phuntsholing- Thimphu Primary National Highway From Icp, Rinchending Till Roundabout
Estimated Cost :14518938 BTN
06 Dec 2024
Bhutan Blacktopping Of Koncholing - Buyang Pnh, From Natongla To Buyang (4.2 Km) The Scope Of Project Includes; Preparation Of Sub-grade, P & L Gsb (l; 4.14 Km, W; Half), Bt Works(l=4.14 Km, W=7.5 M) Which Includes Wmm, Dbm (60 Mm), & Ac (40 Mm), Pw (retaining W
Estimated Cost :91137648 BTN
20 May 2025
Bhutan New Construction, Phase 2, Trong, Trong, Zhemgang
Estimated Cost :2962040 BTN
08 Jul 2024
Bhutan Construction Of Road Approach At Chamina, Department Of Forest And Park Services, Moenr, Thimphu
Estimated Cost :2585953 BTN
30 Jun 2024
Bhutan Supply Of Equipment For Edmo Sector , Haa Dzongkhag (dah)
Estimated Cost :289218 BTN
30 Sep 2024
Bhutan Construction Of Road From Goenpa Junction Till Admin Block Via Conventional Hall Including Blacktopping Work
Estimated Cost :13888567 BTN
15 Aug 2024
Bhutan Package I- Construction Of Potato Integrated Line (pil) At Gyatsha, Bumthang
Estimated Cost :25216219 BTN
26 Dec 2024
Bhutan Construction Of Lama~s Zemchung At Chimithangkha,maedwang,thimphu.
Estimated Cost :2777600 BTN
20 Jun 2024
Bhutan Construction Of Monsoon Restoration Structures On Kheri - Korila Pnh And Trashigang - Rangjung Snh
Estimated Cost :1628798 BTN
04 Sep 2024