Tenderskhoj
Bangladesh
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Bangladesh Construction Of Oxygen Pipe Laying & Installation Of Automatic Control System At The Manifold Room In 04 Hospitals Locations In Bangladesh
Estimated Cost :122884 BDT
06 Jul 2024
Bangladesh Supply, Installation And Commissioning Of Strengthening The Email Services For The Government
Estimated Cost :5209500 BDT
09 Sep 2024
Bangladesh Rehabilitation Of Inverted Design Irrigation Equipment. At Niamotpur Upazila Under Naogaon District.
Estimated Cost :2979090 BDT
25 Jun 2025
Bangladesh 1) Construction Of Ghatla & Guide Wall For Bangla Bazar Central Zame Mosque Pachim Side Pond, Under Haimchar Upazilla. 2) Construction Of Ghatla For Haimchar Union Bazar, Under Haimchar Upazilla. 3) Construction Of 12 Nos Sanitary Toilet For Haimchar Unio
Estimated Cost :1389999 BDT
29 Aug 2024
Bangladesh (1) Sinking A Deep Tube Well Adjacent Of Mizanur Rahman Jahangir Father Name: Late Rustum Ali, Ward-02 Under 03 No Fuljury Union,barguna Sadar,barguna. (2) Construction Of Barandha Grill Infornt Of 03 No Fuljury Union. (3) Sinking A Deep Tube Well Adjacen
Estimated Cost :266000 BDT
19 May 2024
Bangladesh Rehabilitation Of Inverted Design Irrigation Equipment. At Tanor Upazila Under Rajshahi District.
Estimated Cost :2979090 BDT
25 Jun 2025
Bangladesh Rehabilitation Of Inverted Design Irrigation Equipment. At Dhamurhat Upazila Under Naogaon District.
Estimated Cost :2979090 BDT
25 Jun 2025
Bangladesh (1) Sinking A Deep Tube Well Adjacent Of Al-amin Father Name: Anower Hosen Ward-01village: Uttar Boroitala Under 07no Dolua Union, Barguna Sadar, Barguna. (2) Sinking A Deep Tube Well Adjacent Of Md Abul Kalam Father Name: Oyajed Sarder Ward-01 Village: P
Estimated Cost :470250 BDT
19 May 2024
Bangladesh Rehabilitation Of Inverted Design Irrigation Equipment. At Gomostapur Upazila Under Chapai Nawabgonj District.
Estimated Cost :2979090 BDT
25 Jun 2025
Bangladesh Supplying Of Sewing Machine & Installation Of Tube Well For Poor Family, Under Haimchar Upazilla. Package No- 08
Estimated Cost :2999754 BDT
29 Aug 2024