Tenderskhoj
Bangladesh
- Transportation Railways
LOCATION SUMMARY DEADLINE
Bangladesh Complete Over Hauling Of Level Crossing Gate No. E/20 (spl) At Km. 26/6-7 In Between Station Uma-bknd Including Construction Of Drain, Thorough Repairs To Old Road Surface, Goomty & Gate Lodge With Other Allied Works In Connection Of Gph Gate.
Estimated Cost :4376548 BDT
18 Oct 2024
Bangladesh At Ssae/works/tjn Section: Emergency Protection Works For Closing Unauthorized Level Crossing Gate By Rail Piling With Others Related Works.
Estimated Cost :1795693 BDT
29 Aug 2024
Bangladesh M.s.r Items
Estimated Cost :2193994 BDT
23 Jun 2024
Bangladesh Installation Of Row Pillar At Ch. 0+000 Km To Ch. 5+000 Km Of Jibannagar - Dattanagar Road (r-743) Under Road Division, Chuadnaga During The Year 2023-2024.
Estimated Cost :1496828 BDT
30 Jun 2024
Bangladesh At Mdkj & Sje :- Madukhali And Surjonagar Railway Station Platform, Yard And Platform Shade Lighting Along With Other Ancillary Works.
Estimated Cost :1300980 BDT
27 Oct 2024
Bangladesh Renewal Of Domestic Gas Line At 1 No Building Of 3rd Class Staff Quarter And Installation Of Collapsible Gate At 10 No Flat Including Internal Civil And Sanitary Repair Works And Cleaning And Repair A
Estimated Cost :541445 BDT
30 Jun 2024
Bangladesh At Ssae/way/tgi Section :complete Track Renewal By 75 "a" Rail (s/h) With New Psc Sleeper At Loop Line No. 3 (length=0.75 Km) Including Supplying & Spreading Of Ballast At Rajendrapur Station Yard Wit
Estimated Cost :20503093 BDT
28 Nov 2024
Bangladesh At Ssae/way/tgi Section :complete Track Renewal By 75 "a" Rail (s/h) With New Psc Sleeper At Loop Line No. 1 (length=0.75 Km) Including Supplying & Spreading Of Ballast At Sreepur Station Yard With Ot
Estimated Cost :20559956 BDT
28 Nov 2024
Bangladesh At Ssae/way/tgi Section :complete Track Renewal By 75 "a" Rail (s/h) With New Psc Sleeper At Loop Line No. 3 (length=0.67 Km) Including Supplying & Spreading Of Ballast At Bhawal Gazipur Station Yard
Estimated Cost :15605635 BDT
28 Nov 2024
Bangladesh At Ssae/way/tgi Section :complete Track Renewal By 75 "a" Rail (s/h) With New Psc Sleeper At Loop Line No. 1 (length=0.67 Km) Including Supplying & Spreading Of Ballast At Izzatpur Station Yard With O
Estimated Cost :15440521 BDT
28 Nov 2024