Tenderskhoj
Bangladesh
- Consultancy Engineering
LOCATION SUMMARY DEADLINE
Bangladesh Engineering Estimate For Sub-soil Investigation Report And Topographic Survey Of Six Nos. Dilapidated Bridges Including Parts Of Rajshahi Town Bypass (n-603) Road Under Rhd Road Division Rajshahi Duri
Estimated Cost :1798816 BDT
24 Jun 2024
Bangladesh Sub-soil Investigation By Rotary Method Drilling And Psi Test For Investigation Of Well Length (west Pier) Of Fateh Ali Brddge (ch. 0+200) Over Karatoa River On Bogura-sariakandi (z-5032) Road Under Road Division, Bogura During The Year 2023-2024.
Estimated Cost :633687 BDT
20 Jun 2024
Bangladesh Performing & Report Submission Of Sub-soil Investigation At Bogura-naogaon-mohadevpur-patnitala-dhamoirhat-joypurhat (r-545) Road, Rajshahi-nawhata-chowmasia (r-685) & Manda-bagmara-atrai (z-6856) Road Under Rhd Road Division, Naogaon During The Year 2023
Estimated Cost :947958 BDT
13 Jun 2024
Bangladesh Performing & Report Submission Of Sub-soil Investigation At Shapahar-dhamuirhat (z-5468) Road, Mohadevpur (kunjobon)-chtatra-niamatpur (sibpur) (2-5465) Road & Tofiqmour (sibpur)-soboilbazzar-niamotpur (tlb) (z-5466) Road Under Raod Division Naogaon Durin
Estimated Cost :1124008 BDT
13 Jun 2024
Bangladesh Estimate For Construction Of Ghatla At Doshdona Kandapara Road Direction Of East Side River Ghat, In Ward No-02, Under Bancharampur Pourashava, Brahmanbaria.
Estimated Cost :591817 BDT
18 Apr 2025
Bangladesh Estimate For Construction Of Ghatla At Rustom Mia Bari, Jagannathpur Ward No-03, Under Bancharampur Pourashava, Brahmanbaria.
Estimated Cost :333054 BDT
18 Apr 2025
Bangladesh Engineering & Other Equpment Of Electrical Dept(4112304)
Estimated Cost :3500000 BDT
19 Jun 2024
Bangladesh Consultancy Services For Supervision And Technical Support
Estimated Cost :172103793 BDT
31 Jul 2024
Bangladesh Sub-soil Investigation At 1st Km. From 29 Km. I. At 1st Km. (ch. 00+ 000). Ii. At 3rd Km. (ch. 2+ 500). Iii. At 5th Km. (ch. 5+ 000). Iv. At 8th Km. (ch. 7+ 500). V. At 10th Km. (ch. 10+ 000). Vi. At
Estimated Cost :1090569 BDT
29 May 2024
Bangladesh O & M Of E/m Works Services At Jashore Airport, During The Year 2023-2024 (s.h: Supply Of Different Type Filter, Battery , Relay, Fuse Etc For Engine Generating Set I/c Related Works At Jashsore Airpo
Estimated Cost :1525000 BDT
28 May 2024