Tenderskhoj
Bangladesh
- Transportation
LOCATION SUMMARY DEADLINE
Bangladesh Cover Drain, Slab And Street Light Line Extension Etc.
Estimated Cost :688750 BDT
14 Sep 2024
Bangladesh Docking Of Crane-boat Dharla-19 (adjacent To Dredger-kumar) With Chipping, Scraping And Painting Of Main Deck And Superstructure Including Underwater Parts, Repair Of Propulsion Unit And Radar Unit With Miscellaneous Repair Works Of Deck And Engine And Su
Estimated Cost :1028519 BDT
26 Jun 2024
Bangladesh Removal Of Seepage From Kushiyara River Left Embankment From Km 2.600 To Km 4.000 In Between 200 M In Rajnagar Upazilla District Moulvibazar Under Ndr Budget Of Moulvibazar O&m Division, Bwdb, Moulvib
Estimated Cost :267310 BDT
25 Jun 2024
Bangladesh Removal Of Seepage From Kushiyara River Left Embankment From Km 0.000 To Km 2.600 In Between 200 M In Rajnagar Upazilla District Moulvibazar Under Ndr Budget Of Moulvibazar O&m Division, Bwdb, Moulvib
Estimated Cost :267310 BDT
25 Jun 2024
Bangladesh Protective Work By Concrete Slope Protection At 1st Km (p) & 3rd Km (p), Repair With Dbs Wearing Course, Repairing Of Rigid Pavement And Earth Work For Shoulder Repair At Different Km Of Lakhai Thana
Estimated Cost :4497212 BDT
27 Jun 2024
Bangladesh Construction Of Mechanical Garage Shade Up To Plingth Level At Rhd Stack Yeard [5th Km Of Beer Muktijoddha Commandant Manik Chowdhury Road (r-221)] Under Road Division, Habiganj During The Financial Y
Estimated Cost :1347623 BDT
13 Jun 2024
Bangladesh Repair Works Of Dredge Pump Housing-inner-outer Pressure Plate Buildup-machining Along With Swivel Joint- Ladder Pulley And Side Block For Biwta Dredger Sutang Under Dredger Base Aricha.
Estimated Cost :859704 BDT
23 Jun 2024
Bangladesh Providing Slope Protection At East Side Of Ils Sluice Gate Of East Side Connecting Road Pipe Culvert In/c. Other Allied Works At Hsia, Kurmitola, Dhaka.
Estimated Cost :19082251 BDT
30 Dec 2024
Bangladesh Filling Ditches Near Berm To Make Embankment Sustainable Along Chainage Km 1.135 To Km. 1.365 Of Polder No-49 At Chalitabunia Union, Rangabali Under Operational Expenditure Budget Under Patuakhali Wd Division, Bwdb, Kalapara, Patuakhali During The Financi
Estimated Cost :481786 BDT
27 Jun 2024
Bangladesh Adp- Koneshwar And Sidhya
Estimated Cost :796701 BDT
17 Jun 2024