Tenderskhoj
Bangladesh
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Bangladesh Repair Of Bus-bay At 36th(p) Km (begumgonj Chowrasta) Of Feni-noakhali National Highway (n-104) Under Noakhali Road Division During The Year 2023-2024.
Estimated Cost :1539726 BDT
29 Jun 2024
Bangladesh Restoration The Damaged Pavement By Repair Of Potholes, Base Repair By Base Type-ii, Carpeting & Seal Coat At 14th(p), 15th(p) & 16th(p) Km Of Feni (temohoni)-birolibazar-sonaimuri(gazirhat) Road (z-1441) Under Noakhali Road Division During The Year 2023-
Estimated Cost :1771262 BDT
29 Jun 2024
Bangladesh Repair Of Damaged Pavement & Road Surface By Carpeting Seal Coat Work And Protective Work At 1st(p) & 2nd(p) Km Of Dadpurbazar-khalifarhat Road (z-1449) Under Noakhali Road Division During The Year 2023-2024.
Estimated Cost :1769043 BDT
29 Jun 2024
Bangladesh Asphalt Materials Supply For Departmental Maintenance Work At Different Roads Of Barguna Road Division, Under Road Division Bargua During The Year 2023- 2024.
Estimated Cost :2965380 BDT
30 Jun 2024
Bangladesh Repair And Renovation Works Of A Road On The Back Side As Wel As At A Staff Quarter Of Rajshahi Pwd Campus.
Estimated Cost :881705 BDT
26 Jun 2024
Bangladesh Emergency Repair Work Of Pwd Mosque At Pwd Bhaban, Khulna.
Estimated Cost :499417 BDT
03 Jul 2024
Bangladesh Improvement Of Rhd Mukshpur Purba Gps To Sener Bazar Road By Bc At Ch.00m - 1950m Under Trishal Upazila, District: Mymensingh (road Id: 361944059) [salvage Cost: 2805108.00].
Estimated Cost :27168495 BDT
26 Jun 2025
Bangladesh Supply Of Different Spare Parts With Related Services And Denting-painting Works Of J.m. Road Roller No:-16 And Other Related Repair Works Of Clutch System, Transmission System Of J.m. Road Roller No:-11.
Estimated Cost :893218 BDT
19 Jun 2024
Bangladesh Installation Works Of Solar Panel And Construction Of Tin Shade For Biwta Excavator Pontoon-02-03 And 06 Under Dredger Base Aricha.
Estimated Cost :725335 BDT
23 Jun 2024
Bangladesh Maintenance Work Of Existing Pavement By Strengthening, Carpeting & Seal Coat Including Necessary Earth Works At Soft Shoulder From Ch. 10+100 To 10+700 (total Length= 600.00m) Of Dacope-barobaria-mag
Estimated Cost :4848629 BDT
24 Jun 2024