Tenderskhoj
Bangladesh
- Transportation
LOCATION SUMMARY DEADLINE
Bangladesh Removal Of Seepage From Kushiyara River Left Embankment From Km 2.600 To Km 4.000 In Between 200 M In Rajnagar Upazilla District Moulvibazar Under Ndr Budget Of Moulvibazar O&m Division, Bwdb, Moulvib
Estimated Cost :267310 BDT
25 Jun 2024
Bangladesh Removal Of Seepage From Kushiyara River Left Embankment From Km 0.000 To Km 2.600 In Between 200 M In Rajnagar Upazilla District Moulvibazar Under Ndr Budget Of Moulvibazar O&m Division, Bwdb, Moulvib
Estimated Cost :267310 BDT
25 Jun 2024
Bangladesh Protective Work By Concrete Slope Protection At 1st Km (p) & 3rd Km (p), Repair With Dbs Wearing Course, Repairing Of Rigid Pavement And Earth Work For Shoulder Repair At Different Km Of Lakhai Thana
Estimated Cost :4497212 BDT
27 Jun 2024
Bangladesh Construction Of Mechanical Garage Shade Up To Plingth Level At Rhd Stack Yeard [5th Km Of Beer Muktijoddha Commandant Manik Chowdhury Road (r-221)] Under Road Division, Habiganj During The Financial Y
Estimated Cost :1347623 BDT
13 Jun 2024
Bangladesh Repair Works Of Dredge Pump Housing-inner-outer Pressure Plate Buildup-machining Along With Swivel Joint- Ladder Pulley And Side Block For Biwta Dredger Sutang Under Dredger Base Aricha.
Estimated Cost :859704 BDT
23 Jun 2024
Bangladesh Providing Slope Protection At East Side Of Ils Sluice Gate Of East Side Connecting Road Pipe Culvert In/c. Other Allied Works At Hsia, Kurmitola, Dhaka.
Estimated Cost :19082251 BDT
30 Dec 2024
Bangladesh Filling Ditches Near Berm To Make Embankment Sustainable Along Chainage Km 1.135 To Km. 1.365 Of Polder No-49 At Chalitabunia Union, Rangabali Under Operational Expenditure Budget Under Patuakhali Wd Division, Bwdb, Kalapara, Patuakhali During The Financi
Estimated Cost :481786 BDT
27 Jun 2024
Bangladesh Adp- Koneshwar And Sidhya
Estimated Cost :796701 BDT
17 Jun 2024
Bangladesh Procurement Of Different Accessories For Marine Engineering Department
Estimated Cost :1249401 BDT
12 Sep 2024
Bangladesh Re-sectioning Of Embankment From Ch. Km 11.960 To Ch. Km 12.730 = 0.770 Km Of Polder No. 39/2d At North Gillabad In Mathbaria Upazila Of Perojpur District Under Perojpur O & M Division, Bwdb, Perojpur During The Fy 2023-2024.
Estimated Cost :4494660 BDT
31 Dec 2024