Contracts Awarded by Haryana Government | Tenderskhoj
Haryana
- Transportation Railways

Welcome to Haryana Govt Tenders information ! Search for haryana tenders from one of the largest tender information service providers for haryana govt tenders. View the latest updated panchayati raj haryana tenders and other tenders floated out by various government authorities in Haryana. We do provide you an option of getting free trial of live tender alerts available for haryana irrigation department tenders, huda faridabad tenders, haryana pwd tenders online, haryana pwd br tenders, phed haryana tender, haryana pwd tenders, sanitation tender haryana, etc in this webpage.

LOCATION SUMMARY DEADLINE
Haryana Supply Of Air Brake Cylinder #*. Air Brake Cylinder (cast Iron) Drg. No. 3d/12a.00.116 Alt (nil).
Estimated Cost :130390 INR
28 Jul 2024
Haryana Supply Of Top Side Bearer Liner #*. Top Side Bearer Liner As Per Rdso's Drg. No. Wd - 09034 - S - 08, Item No.11, Alt. No. 6. [warranty Period: 30 Months After The Date Of Delivery ]
Estimated Cost :556666 INR
28 Jul 2024
Haryana Supply Of Kit Of Pu Paints (two Pack) For Shalimar Express - Lhb Coaches. Detailed Description Is As Per Attached Pdf File.special Terms & Conditions:(i) The Goods Should Be Dispatched Within 04 Months From The Date Of Manufacturing And Firm Will Give An
Estimated Cost :53836 INR
30 May 2024
Haryana Supply Of Ar Supporting Bracket #*. Auxiliary Reservoir Supporting Bracket As Per Drawing No. Wd-00039-s-05 Alt. 2 Item No.7. [ Warranty Period: 30 Months After The Date Of Delivery ]
Estimated Cost :145494 INR
27 Jul 2024
Haryana Supply Of Lever Hanger For Bogie Brake. #*. Lever Hanger For Bogie Brake [ Bmbc ] Drawing No. T-3-2-802 Alt [ H ] Item-5 [ Warranty Period: 30 Months After The Date Of Delivery ]
Estimated Cost :165200 INR
27 Jul 2024
Haryana Supply Of Water Tank (450 Litre) #*. Water Tank (450 Litre) Complete Without Frame Upper Part (item No. 3) As Per Drawing: Lp63117 Alt F Or Latest (mdts 093 Rev 08 Is Applicable) [ Warranty Period: 84 Months After The Date Of Delivery ]
Estimated Cost :213344 INR
24 Jul 2024
Haryana Supply Of Connecting Rod For Brake Gear. #*. Connecting Rod For Brake Gear. Drawing No :- Wd - 90030 - S - 58, Alt. 11, Item No. 1. [ Warrantyperiod: 30 Months After The Date Of Delivery ]
Estimated Cost :84417 INR
26 Jul 2024
Haryana Supply Of Gasket Rocker Lever Cover #*. Gasket Rocker Lever Cover Drg No.cil Part No 3077198.
Estimated Cost :30114 INR
25 Jul 2024
Haryana Supply Of Seal Oil As Per Cummins Part No. 3870890 #*. Seal Oil As Per Cummins Part No. 3870890 For Cummins Engines Of Power Car [ Warrantyperiod: 30 Months After The Date Of Delivery ]
Estimated Cost :213971 INR
27 Jun 2024
Haryana Supply Of Universal Led Indicator, White, 24 V Dc, 22.5mm As Per Rdso Specification No. Rdso/pe/spec/tl/0195-2019 (rev. 0) [ Warranty Period: 30 Months After The Date Of Delivery ]
Estimated Cost :63720 INR
27 Jul 2024