LOCATION SUMMARY DEADLINE
Jordan Upgrade Al-shaer Solid Waste Transfer Station
Estimated Cost :461200 INR
01 Sep 2027
Jordan Contract Awarded For Package 1: Reconstruction Of Wpss*construction Of Four Puming Stations (ps1, Ps2, Ps2, And Ps4 ), And Related Force Mains West Irbid Wastewater Networks / Package (1): Reconstruction Of Wpss* Construction Of Four Pumping Stations (p
28 Apr 2027
Jordan Contract Awarded For Package 2*: Construction Of Collection Systems And Relted Gravity Trunk Lines For The Towns Of Kufr Asad And Qumm Package 2*: Construction Of Collection Systems And Related Gravity Trunk Lines For The Towns Of Kufr Asad And Qumm Con
10 Nov 2027
Jordan Contract Award: Enviromental And Social Consultancy Services For Rehabilitation Of Water Network In Different Areas In Amman Project And Rehabilitation Of Water Network In Wadi Al Sairproject Id: P176619 procurement Method Direct Selection language Of Not
01 Mar 2026
Jordan Contract Awarded For capacity-building Training On Air Quality For West Asian Countries 15-17 Sep 2025 - Event Contract Value (usd) 37991.53 Award Date September 2025.capacity-building Training On Air Quality For West Asia Countries 15-17 Sep 2025 - Eve
Estimated Cost :37992 USD
09 Jul 2026
Jordan Contract Awarded For 132/33 Kv New Fuhies Substations Equipment, Extension And Replacement In Existing Substations (abdali, Salt, New Ma'an, Aqaba Ps) - Lot(s): 1 132/33 Kv New Fuhies Substations Equipment, Extension And Replacement In Existing Subs
Estimated Cost :11108434 USD
26 Jan 2026
Jordan Contract Awarded For unodc Eventat The Dead Sea-king Hussein Bridge Contract Value (usd) 34491.53 Award Date 18-jun-2025.unodc Eventat The Dead Sea-king Hussein Bridge
Estimated Cost :34492 USD
18 Apr 2026
Jordan Contract Awarded For the Development Of A Detailed Design For A Nature-based Solution and Flood Mitigation Measure In Prince Rashed District, Amman un Operational Rates Of Exchange: 1 Usd = 0.708 Jod Contract Value (usd) 62867.23 Award Date 06-may-2025.
Estimated Cost :62867 USD
06 Mar 2026
Jordan Contract Awarded For the Development Of A Detailed Design For Nature-based Solution and Flood Mitigation Measures In 60 Road Deir Ghbar Districtamman. Un Operational Rates Of Exchange 1 Usd = 0.708 Jod Contract Value (usd) 62161.02 Award Date 06-may-2
Estimated Cost :62161 USD
06 Mar 2026