
| LOCATION | SUMMARY | DEADLINE |
|---|---|---|
| Ireland | Design Stage Of The 100km Cork-limerick MotorwayEstimated Cost :15000000 EUR |
31 Mar 2027 |
| Ireland | The M20 Design Stage Of The 100km Cork-limerick Motorway.Estimated Cost :15000000 EUR |
31 Dec 2027 |
| Kazakhstan | Extension in Kazakhstan as gas drilling surges |
31 May 2029 |