Scope : Graca Aranha Substation is a 800kV substation located at Graca Aranha, Maranhao, Brazil. The substation is proposed and is expected to be commissioned in 2027. The Graca Aranha Substation will be operated by Operador Nacional do Sistema Eletrico.
The designed voltage level of the substation is 800kV and the operating voltage level is 800kV. The step in voltage of the project is 800kV.
Graca Aranha Substation is owned by Operador Nacional do Sistema Eletrico.
๐ Key Information
๐
Tender Reference No.
508032483
๐
Publication Date
06 Sep 2024
๐ฐ
Estimated Value
N/A
๐
Sector
Energy, Power and Electrical
๐
Deadline
31 Dec 2027
๐
Notice Type
Projects
๐
Location
Brazil
๐
Contract Duration
3 Years 3 Months 25 Days