📋 Tender Overview
Testing of the natural gas transmission system from židilovo to skopje and the distribution gas pipeline skopje south using the in-line method, as well as testing of the deve bair-židilovo 0-4 km and the distribution gas pipelines skopje north 1.8 km, bunarcik 5.4 km, kumanovo 7.7 km, kratovo 4.6 km, and kriva palanka 1.5 km using ndt methods.