📋 Tender Overview
Remove existing cooling coils and associated piping, remove existing humidifiers and associated piping, cap at main. Existing air handling unit intake and dampers to remain, existing filter banks to remain, existing boilers to remain. Associated piping to be removed as required to facilitate coil removal and replacement. Contractor to include costs for temporary heat if piping is removed. Existing combustion air intake and fan to remain. Reinstall any removed piping so heating system operates as before, re-insulate any removed piping to match existing. Place boiler back in operable condition, rebalance fan to 13,500 cfm, and supply and replace filters FB-1 upstream of coil after installation. New refrigerant piping to/from CU-1 to follow existing piping routing path. Confirm exact location on site prior to installation. cooling coils, humidifiers, filters FB-1, refrigerant piping, heating system components