📋 Tender Overview
The work involves the removal and replacement of existing HVAC components, including the removal of the existing condensing unit, refrigerant piping, and associated electrical wiring. The contractor is required to install a new condensing unit (CU-1) supported on existing steel posts, provide new galvanized steel framing, and ensure proper operation of existing air dampers. The contractor must also rebalance supply and return fans, confirm all sizes and routes on site, and ensure that all electrical work conforms to current codes. Temporary heating must be provided during the removal of coils, and the contractor must coordinate any shutdowns with the owner. New condensing unit (CU-1), new breaker, new refrigerant piping, new wiring, galvanized steel frame