📋 Tender Overview
The planned Shepard to Bow construction package spans from Shepard Station (Sta 100+000) to the future Ogden Bridge (Sta 111+700), excluding the Barlow Trail Bridge segment (Sta 101+900 to Sta 102+850). Proponents are to note that a discontinuity in chainage exists between Sta 108+100 and Sta 110+000. Rails