π Tender Overview
(A)Nagpur Division Casual renewal of CS, CMS, TWS, DS & TTR(TFR),(B)Nagpur
division-Casual renewal of Rails=3.33kms & Casual renewal of sleeper=3.33 kms.
(C)Nagpur division-Replacement of overaged SEJ by TWSEJ-42 Sets.
(D)TTR(FS+TWS+WCMSC)=14nos (1 in 8.5=9nos, 1 in 12=5nos) G.TOTAL=14 nos
in Branch lines of NGP Division.(E)Proposed TBR from (A)-1)kms 811.00-
818.00=7.00kms-SL,2)kms 840.786-841.000=0.214 kms-SL, Total=7.214 kms in
Butibori-Umred section,(B)-1)kms 1041.00-1041.600=0.600kms DN
RD,Total=0.600 kms in Itarsi-nagpur Section,(C)-1)kms 824.200-825.500=1.300
kms UP RD,2)kms 835.00-836.200=1.200kms UP RD, Total=2.500kms in Nagpur-
Badnera section, G.Total=10.314kms in Nagpur Division.(F)Detailed estimate for
TRR(P) at 1) 717.00-736.00=19.00Kms SL, G.Total kms=19.00 kms in Narkher-
Chandur bazar section.(G) Detailed estimate for TRR(P) at 1) kms.775.8-
777.1=1.3kms UP RD,2)kms 778-797.46=19.46kms UP RD, 3)kms 799.04-
800=0.96kms UP RD G.Total Kms=21.72kms in between Wardha-Nagpur Section.