📋 Tender Overview
Mirror Assembly. .#* Mirror Assembly, as per ICF Drg. No. ICF/STD-6-3-008, Alt. %u2018q%u2019/Nil, Col. I. P
acking shall be as per ICF/J&T/SK-1722. Material and specification shall be as per the drawing. [ Warr
anty Period: 30 Months after the date of delivery ]
[Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permit
ed: Max 8 lacs ] ]