📋 Tender Overview
A Marine Consultant Is Required For Preliminary (Feasibility) And Design (Stages 1 And 2) For A Pontoon Structure Alongside The Abbey Pier On Sherkin Island. Concept And Designs Need To Be Developed Followed By The Submission Of A Marine Area Consent (Mac)