📋 Tender Overview
The project involves the maintenance and servicing of a fire alarm and fire fighting system, diesel generator set, pump set, uninterruptible power supply (UPS), EPABX system, and central heating plant at Gorton Castle Building. The scope includes annual comprehensive maintenance of two 60 KVA UPS units, ensuring operational efficiency and addressing any required repairs. 2 x 60 KVA UPS, Fire Alarm System, Fire Fighting System, DG Set, Pump Set, EPABX System, Central Heating Plant