📋 Tender Overview
The work involves the installation of climate control systems in buildings 6 and 7, including the installation of climate split systems and minor modifications to the sanitary and heating systems. Specific tasks include the dismantling and installation of wastewater and drinking water pipes, installation of climate split devices, and various heating system modifications. Climate split devices, climate ceiling cassette, climate outdoor unit, copper refrigerant lines, existing panel radiators, steel heating pipes, fire protection sleeves, fire protection collars, necessary brackets and fastenings