📋 Tender Overview
The project involves the installation of air change units, GI ducts, and split-type AC units along with associated electrical work for sterile storage areas in the CSSD unit at the old pharmacy block of JIPMER. This includes the setup of a PUF-insulated plenum box with a chilled water cooling coil for localized cooling, repairs to the ventilation system, and ducting. Air change units, GI ducts, split-type AC units, PUF-insulated plenum box, chilled water cooling coil, ventilation system components, electrical fittings.