📋 Tender Overview
The Existing Lphw Space Heating Installation In The Original School Building Dates Back To The Time Of Construction Of The Building In 1983 And Is In A Poor Condition At This Stage And Requires To Be Replaced. There Is No Cavity Insulation In The 1983 Building, With Only 100 Mm Of Attic Insulation In This Section Of The Building Also. The Proposed Climate Action Works Consist Of The Provision Of The Top Up Of The Existing Attic Insulation, Provision Of Pumped Cavity Wall Insulation, Provision Of A Heat Pump System And The Provision Of An Twin Ev Charging Pedestal. The Area Of The Building For Which The Proposed Works Are Required Consist Of The Original 1983 School Building Which Has A Total Floor Area Of Approx. 1235M2 And Comprises 8 Number Mainstream Classrooms, Resource Rooms, Staff Room, Library, Offices, Male And Female Toilets And Staff Toilets, Gp Hall, Heating Centre, Stores, And Circulation Areas. Approximate Budget For The Project Is €680,000