📋 Tender Overview
Execution of the works for the refurbishment of the executive project for the rehabilitation of the indoor beach and the two pools of the municipal sports center Espai Blau, in Sant Pere de Ribes. The approved project includes two interrelated actions: the structural rehabilitation and finishing of the indoor beach and the two pool basins, and the partial reform of the technical facilities serving this same facility from the underground level. Persistent leaks have damaged part of the reinforced concrete structure that makes up the pool basins and adjacent elements, and on the other hand, the existing technical installations have reached the end of their useful life and do not meet current requirements for energy efficiency, water treatment, and sanitary quality. For this reason, the project provides, in a coordinated manner: - The reconstruction of damaged concrete elements using structural repair techniques with specific mortars, restoration of reinforcements, cathodic protection with sacrificial anodes, and corrosion and anti-carbonation inhibitor treatments. - The execution of a new waterproofing system for the beach and basins, as well as the reconstruction of ceramic finishes and auxiliary elements. - The partial renewal of hydraulic installations (heating, plumbing, ACS, and fire protection), electrical systems, and air conditioning. - The replacement of the pool water filtration system with a regenerative filter system using expanded perlite (EFS), the incorporation of a dechloramination system using medium-pressure ultraviolet light, and a new automation and control system.