📋 Tender Overview
The execution of the initiative to install public lighting fixtures on existing poles in the public roads of the La Granja commune is required; it is considered to install 6,740 new LED lights. The work to be developed involves: - Disconnection, relocation, and removal of lights, both the lights that are part of the replacement and the existing ones that are no longer operational. - Provision of new LED lights that must illuminate equally or better than the lights being replaced, according to the characteristics presented later. The road lights must be of the same design, varying in their power, and must be installed on existing or new hooks, according to the plans. - Update the complete registry of the public lighting to be intervened, georeferencing each installed light, each control cabinet, and the lights included in each collective circuit. - Provision and installation of concentric cable for powering the new LED light. - Provision and installation of electrical protection API box, according to standards, in new lights, when applicable. - Connection to the distribution or public lighting network, as appropriate with CALPE and connections. - Provision and installation of electrical connections, according to the project to be developed. - Increase or decrease the capacity of existing connections, when applicable. In cases where it is possible to decrease or change to a single-phase connection with 40 Amperes in BT1 rate, it will be mandatory to make the change. - Provision and installation of a network with CALPE conductor. - Clearing branches in the places where the lights will be installed, throughout the projected beam down to the ground and CALPES for the necessary networks. - Preparation and processing of electrical projects for A.P. to obtain TE2 certificate in the SEC for all intervened circuits, processing with ENEL of the connections and electricity supply contracts to opt for the BT1 rate not exceeding 9.9 Kw per connection, where it must also inform ENEL of the lights that were directly connected to the network, which will be switched to established circuits according to projects when applicable. For the TE2 certificate, compliance with Exempt Resolution N29.935 of 2019, which modified Exempt Resolution N 1.128 of 2006, both from the Superintendence of Electricity and Fuels, must be considered.