📋 Tender Overview
Execution Of Central Heating With A Pellet Boiler Along With Domestic Hot Water - Connect The Boiler With A Coil To The Central Heating Installation And Carry Out Proper Exhaust Ventilation In The Bathroom Of Residential Unit No. 4 In The Building At Dlugosza 2 In Walbrzych In The Design And Build Mode (Single-Stage).