📋 Tender Overview
Excavation for foundation and pipe trenches in hard murum, including removing the excavated material up to a distance of 50 meters, stacking and spreading as directed by the Engineer-in-charge, normal dewatering, preparing the bed for foundation, and excluding backfilling. Refilling the trenches with available material first over the pipeline and then hard material, including all leads and lifts. Transportation of material obtained from excavation including soil, rubble, bricks, RCC concrete, kerb stones, steel railing, iron pipes, channels, etc. Lowering, laying, and jointing R.C.C. pipes in proper grade and alignment. Repairing/lifting of inspection chamber/storm water chamber, including demolition of existing inspection chamber, transportation of demolished material, and construction of new inspection chamber as directed by the Engineer-in-charge. R.C.C. pipes, inspection chamber, hard murum, soft material, bricks, concrete, kerb stones, steel railing, iron pipes, channels