📋 Tender Overview
The project involves the excavation of an elephant-proof trench with a top width of 3.0 meters, a depth of 3.0 meters, and a bottom width of 1.5 meters. The work includes stacking and depositing the excavated soil uniformly on the inner side of the trench, forming a conical mound of 1.5 meters in height, compacting the mound, and managing all necessary leads, explosives, labor, and machinery. Excavation of Elephant-Proof Trench