📋 Tender Overview
The work involves the development and equipment of new plots in the Delegation of Lake Guiers as part of the DELTA program. This includes three lots: Lot 1 focuses on the development and equipment of the Yamane Pénène and Dental plots; Lot 2 involves the development and equipment of the Ndimb, Bas Ferlo, and Diélaly plots; Lot 3 pertains to the development and equipment of the Kilif 2 plot, which includes a firm tranche for drilling and pumping tests to determine groundwater productivity, and a conditional tranche for equipping the boreholes and developing the plot, dependent on the results of the pumping tests. The execution period for the works is twelve months for Lots 1 and 2, and ten months for Lot 3. civil engineering works, hydraulic works, irrigation equipment, drilling equipment