📋 Tender Overview
Design services for the railway infrastructure objective on the Valcine? – Ocni?a – Bal?i – Ungheni – Chi?inau – Cainari sector, for the execution of track works for medium repairs totaling 96 km, major repairs – 64 km, and repairs by lifting – 23 km. The total length of the railway lines subject to repair is 183.3 km.